Leave Your Message
Drill Rig Deadline Anchor for Hoisting Safety
Drill Rig Accessories for Drilling & Workover Operations

Drill Rig Deadline Anchor for Hoisting Safety

> Can be used in drilling rig, workover drilling rig etc.

> Material is High strength steel, extended the service time.

> 1.5 times pressure and tensile test before leaving the factory, high precision, stability, etc.

> Two forms, horizontal and vertical.

    Deadline Model Weight indicator
    Model
    Max.Deadline Pulling
    Force
    (kN)
    Qty of the
    line
    Capacity
    (kN)
    Output pressure
    sensor
    (MPa)









    Vertical
    JZG42 JZ500 420  12  5040 
    10  4200 
    JZG35 JZ400 350  12  4200 
    10  3500 
    JZG24 JZ250 340  10  2880 
    2400 
    JZG20 JZ200 200  10  2000 
    1600 
    JZG18A JZ150A 180  10  1800 
    1440 
    1080 
    JZG15A JZ100A 150  1200 
    900 







    Horizontal
    JZG41 JZ500A 410  12  4920  6.83 
    10  4100 
    JZG34A JZ400B 340  12  4080 
    10  3400 
    JZG18 JZ150 180  1440 
    1080 
    JZG15 JZ100 150  1200 
    900 
    JZG10A JZ40 100  600 
    400 
    We can designed asyour request.

    Deadline anchor is used as a display instrument for indicating and recording the drilling string changes in weight and pressure, helping the driller to master the working parameter and judge the drilling state in drilling operation. It’s mainly composed two parts: Body and Senor. It work together with the Weight indictor.